The General Plan

Build

FAA Proposes West Palm Beach Airspace Overhaul, GE Engine AD, and Noise Cert Renewal

The FAA has opened three concurrent comment periods covering Class C airspace restructuring at President Donald J. Trump International Airport, an airworthiness directive for GE Passport engines, and a renewal of noise certification data collection requirements.

Class C Airspace Amendment at DJT, West Palm Beach

The FAA has issued a notice of proposed rulemaking (NPRM) to amend Class C airspace at President Donald J. Trump International Airport (DJT) in West Palm Beach, FL, with comments due on or before January 12, 2027. The agency states the action is intended to enhance the efficient management of air traffic operations and reduce the potential for midair collision in the West Palm Beach, FL, terminal area.

The document provides substantial background on the complexity of the airspace involved. DJT is located three miles west of the city of West Palm Beach, FL, and its air traffic control facility consists of a combined Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facility operating 24 hours a day. Palm Beach County Park Airport (LNA), a non-towered reliever airport, is located approximately five miles south of DJT. The document states that the airspace surrounding DJT and LNA is complex and crowded due to the proximity of the two airports, and that there are 6 airports with operational ATCTs and 19 non-towered satellite airports near DJT managed within the terminal area. The proposal would amend FAA Order JO 7400.11M, dated July 30, 2026, and effective September 15, 2026, with updates to be published in the next update to FAA Order JO 7400.11, which is incorporated by reference in 14 CFR 71.1.

The document notes that on May 14, 2026, the FAA published a final rule (91 FR 27198) amending 14 CFR part 71 to change the airport name from "Palm Beach International Airport (PBI)" to "President Donald J. Trump International Airport (DJT)." The current NPRM reflects the new airport name, but the document states that the information gathered while the airport was previously named PBI is unchanged. The FAA's authority for the rulemaking is grounded in Subtitle VII, Part A, Subpart I, Section 40103 of Title 49 of the United States Code, under which the FAA is charged with prescribing regulations to assign the use of airspace necessary to ensure the safety of aircraft and the efficient use of airspace.

Airworthiness Directive: GE Passport Engines

The FAA has proposed a new airworthiness directive (AD) for certain General Electric Company GE Passport 20-17BB1A, GE Passport 20-18BB1A, GE Passport 20-19BB1A, and GE Passport 20-19BB1B engines, with comments due by December 28, 2026 — the nearest deadline among the actions covered here.

The document explains that the proposed AD was prompted by an engine in-flight shutdown (IFSD) due to an engine fire caused by fuel leakage within the engine core compartment. A manufacturer investigation revealed that hot gas leakage at the high-pressure compressor (HPC) case split line eroded a start bleed valve (SBV) fuel tube, causing fuel leakage and an engine core compartment fire. The document states that as a result, the manufacturer redesigned the SBV fuel tube to prevent erosion from hot gas impingement. The proposed AD would require replacement of the affected SBV fuel tube with the redesigned version. The FAA states this condition, if not addressed, could result in engine fire and damage to the airplane.

The FAA estimates the proposed AD would affect 126 engines installed on aircraft of U.S. registry. The agency estimates the cost of the SBV fuel tube replacement at 36 work-hours at $85 per hour, equaling $3,060 in labor cost, plus $1,997 in parts cost, for a total cost per product of $5,057 and a total cost on U.S. operators of $637,182.

Noise Certification Data Collection Renewal

Also carrying a January 12, 2027, comment deadline, the FAA is seeking OMB renewal of its information collection under 14 CFR part 36 covering noise certification standards for subsonic jet airplanes, subsonic transport category large airplanes, small propeller driven airplanes, and rotorcraft (OMB Control Number 2120-0659). The document states the original information collection was implemented to show compliance with the Aircraft Noise Abatement Act of 1968, which is now codified as part of the FAA's regulatory authority over aircraft noise in 49 U.S.C. 44715.

The document explains that the information collected consists of the results of noise certification tests that demonstrate compliance with 14 CFR part 36. Each applicant's collected information is incorporated into a noise compliance report provided to and approved by the FAA, which the agency uses in making a finding that the airplane is in noise compliance with the regulations. The document states these compliance reports are required only once when an applicant seeks to certificate an aircraft type, and that without this data collection, the FAA would be unable to make the required noise certification compliance finding. For the renewal, the FAA proposes 18 total noise certification projects per year, with an estimated average burden of 200 hours per applicant for the compliance report, an estimated cost of $20,912 per applicant, and a cumulative total annual burden of $376,416 for 18 applicants.

What to watch

  • December 28, 2026: Comment deadline for the proposed AD on GE Passport engines (Docket No. FAA-2026-13813; Project Identifier AD-2026-00061-E).
  • January 12, 2027: Comment deadline for the Class C airspace NPRM at DJT, West Palm Beach, FL (14 CFR 71).
  • January 12, 2027: Comment deadline for the FAA's noise certification information collection renewal (OMB Control Number 2120-0659).

What this means for recipients

State, local, and tribal governments and their consultants in the West Palm Beach, FL, terminal area should note that the proposed Class C airspace amendment directly affects airspace structure under 14 CFR 71 and may alter flight procedures or airspace boundaries relevant to publicly operated airports in the region. Aviation operators with GE Passport 20-series engines on U.S.-registered aircraft face a potential mandatory SBV fuel tube replacement requirement under the proposed AD, with estimated per-unit compliance costs of $5,057 as stated in the document. Aircraft manufacturers or applicants seeking type certification under 14 CFR part 36 are the identified respondents for the noise certification data collection renewal, with the FAA noting compliance reports are required once per aircraft type certification.

Related

Sources

25 cited

Every hard fact above is grounded in and cited to a primary source record.

  1. The FAA has issued an NPRM to amend Class C airspace at President Donald J. Trump International Airport (DJT) in West Palm Beach, FL.

    federalregister.gov
  2. The FAA states the action is intended to enhance the efficient management of air traffic operations and reduce the potential for midair collision in the West Palm Beach, FL, terminal area.

    federalregister.gov
  3. DJT is located three miles west of the city of West Palm Beach, FL.

    federalregister.gov
  4. DJT's air traffic control facility consists of a combined Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facility operating 24 hours a day.

    federalregister.gov
  5. Palm Beach County Park Airport (LNA) is a non-towered reliever airport located approximately five miles south of DJT.

    federalregister.gov
  6. The document states the airspace surrounding DJT and LNA is complex and crowded due to the proximity of the two airports.

    federalregister.gov
  7. There are 6 airports with operational ATCTs and 19 non-towered satellite airports near DJT managed within the terminal area.

    federalregister.gov
  8. The proposal would amend FAA Order JO 7400.11M, dated July 30, 2026, and effective September 15, 2026.

    federalregister.gov
  9. On May 14, 2026, the FAA published a final rule (91 FR 27198) amending 14 CFR part 71 to change the airport name from 'Palm Beach International Airport (PBI)' to 'President Donald J. Trump International Airport (DJT)'.

    federalregister.gov
  10. The proposed AD covers certain General Electric Company GE Passport 20-17BB1A, GE Passport 20-18BB1A, GE Passport 20-19BB1A, and GE Passport 20-19BB1B engines.

    federalregister.gov
  11. Comments on the proposed GE Passport AD are due by December 28, 2026.

    federalregister.gov
  12. The proposed AD was prompted by an engine in-flight shutdown (IFSD) due to an engine fire caused by fuel leakage within the engine core compartment.

    federalregister.gov
  13. A manufacturer investigation revealed that hot gas leakage at the high-pressure compressor (HPC) case split line eroded a start bleed valve (SBV) fuel tube, causing fuel leakage and an engine core compartment fire.

    federalregister.gov
  14. The proposed AD would require replacement of a certain SBV fuel tube with a redesigned SBV fuel tube.

    federalregister.gov
  15. The FAA estimates the proposed AD would affect 126 engines installed on aircraft of U.S. registry.

    federalregister.gov
  16. The FAA estimates the cost of SBV fuel tube replacement at 36 work-hours at $85 per hour, equaling $3,060 in labor cost, plus $1,997 in parts cost, for a total cost per product of $5,057.

    federalregister.gov
  17. The total estimated cost on U.S. operators is $637,182.

    federalregister.gov
  18. The FAA is seeking OMB renewal of its information collection under 14 CFR part 36 covering noise certification standards (OMB Control Number 2120-0659), with comments due January 12, 2027.

    federalregister.gov
  19. The original information collection was implemented to show compliance with the Aircraft Noise Abatement Act of 1968, now codified as part of 49 U.S.C. 44715.

    federalregister.gov
  20. For the renewal, the FAA proposes 18 total noise certification projects per year.

    federalregister.gov
  21. The estimated average burden per applicant is 200 hours for the compliance report.

    federalregister.gov
  22. The estimated cost is $20,912 per applicant and a cumulative total annual burden of $376,416 for 18 applicants.

    federalregister.gov
  23. The document states that without this data collection, the FAA would be unable to make the required noise certification compliance finding.

    federalregister.gov
  24. Comments on the Class C airspace NPRM must be received on or before January 12, 2027.

    federalregister.gov
  25. The document states compliance reports under 14 CFR part 36 are required only once when an applicant seeks to certificate an aircraft type.

    federalregister.gov